2x3.916 MW Power Plant

(2 x TBG 632 V 16 DEUTZ (MWM) ENGINES)

Each engine operates a generator of 4.850 kVA electrical output.

The current of each generator is sent to apart 11 kV set-up transformer.

Current situation of the engines : The installation has running time of the engines of 46.300 h and 45.300 h hours respectively

Steam generation

The exhaust gas from engines were directed to heat recovery steam generators (boilers) that produce 3 t/h saturated steam at 7,5 bar using the heat produced by the exhaust gas. Steam Conditions per engine. Hot Water The thermal energy from the HT and LT coolant circuits of the engine were also used to produce 2.132 kWh/engine.